Experience Profile :
- 50 MW+ Gas/Oil based Power/Cogen installed/under execution
- 400 MW+ Solar power plant installed/under execution
- 1500+ MW Diesel Generators installed/under execution
An excerpt of Key Projects in Nigeria in the last 12 years are as follows :
S/No | Project / Order details | Product | Status |
1 | Oando/Alausa, Lagos State Governor Office Power Project, Nigeria | 2 x 3.3 MW Jenbach GEG + 2 x 2.5 MVA DG + BOP | Commissioned & Handed Over-Oct 2013 |
2 | Shoreline / Lafarge Cement, GT based Power Project, Nigeria | 3 x 5.5 MW Solar Turbines + BOP | Commissioned & Handed Over-May 2014 |
3 | Geeta Plastics, GEG based Captive Power Plant, Nigeria | 1 x 1.89 MW GEG + BOP | Commissioned in Apr 2014 |
4 | Cadbury Nigeria PLC | 3 x 1.5MW | Commissioned in April 2017 |
5 | Reliance Chemicals Agbara | 1 x 1.5MW | Commissioned in 2018 |
6 | Kuker Farms Abeokuta | 2 x 0.5MW | Commissioned in 2019 |
7 | Powering Bayelsa Through Sustainable Partnership | 1 x 65MW |
|
8 | Powering Sustainable Transit at NRC | 1 x 6MW |
|
3 x 5.5MW Shoreline -Nigeria
Tailor-Made Solutions
-
1
Site conditions diagnosed to propose main driver as Gas Turbine instead of Customer’s RFP for Gas Engines
-
2
Gas turbine commissioned in system with heavy jerks
-
3
Gas Turbine successfully synchronized with existing Gas Engines
-
4
Commissioned May 2014
Alausa IPP (10.6 MW) EPC - Lagos
Tailor-Made Solutions
-
1
Uneven landscape with slope downward bending
-
2
Instead of backfilling the natural slope was maintained by sloping roads and drainage system
-
3
Used pre-fabricated modules to improve overall quality and reduce site installation time
-
4
Commissioned & Handed Over-Oct 2013
1 x 1.89MW Geeta Plastics Nigeria
Tailor-Made Solutions
-
1
Given Plot size had limited available space
-
2
Equipment fit by shifting radiator and cooling tower on the roof
-
3
Used pre-fabricated modules to reduce site installation time and improve overall quality
-
4
Commissioned April 2014
3 x 1.5MVA CADBURY, IKEJA
Tailor-Made Solutions
-
1
Cadbury Nigeria PLC
-
2
Commissioned in April 2017
3.5 Mw with 2 x 1364 + 1 x 775 Kw Containerized
Gas Genset based Power Plant, for Sapio Utilities, Lagos.
25 Mw with 5 x 5000 Gas Genset
based Power Plant at Seghzi Power Plant
Substation Maintenance and Construction
Construction and Installation of Distribution Network
Cable sleeves installation along Lekki- Ikoyi bridge
Rehabilitation of classrooms with Toilets
Streetlights installation in Lekki Phase 1
Construction of Kolawole Lawson Street, with Street Lights
Powering Bayelsa Through Sustainable Partnership
Powering Sustainable Transit
TIS Renewable Energy Limited has installed a cutting-edge 6MW gas-powered plant at the Nigerian Railway compound in Ebute-meta, Lagos. This turnkey solution generates electricity from clean-burning natural gas, promoting thermal efficiency and low emissions for the Lagos-Ibadan transit services.
As a pilot project, the plant demonstrates TIS Renewable Energy Limited’s commitment to sustainable energy solutions in Nigeria’s transportation sector. Through innovative gas power generation, we’re enabling eco-friendly rail operations while driving progress toward a greener future.